Scope
Preparation of detailed project documentation.
Manufacture and delivery of the concrete shielding structure of the experimental cellar, including two heavy sliding shielding gates of 25 and 20 tonnes and their drives. Lining of the inner surface of the cellar with polyethylene containing boron.
Installation and testing of the structure at ESS in Sweden.